Pot Melt/Casting Firing Schedule

Pot Melt/Casting Schedule (3/8″ final thickness) (9.5mm)

Ramp Tem (F) Hold Tem (F) Hold Time | Ramp Temp (C) Hold Temp (C) Hold Time
300 500 40 | 166 260
300 1100 40 | 166 593
350 1850 18 | 194 1010
9999 1060 45 | 9999 571
50 850 0 | 27 455
100 650 0 | 55 398

This is a very basic casting schedule. If you change the final thickness, you must also adjust the hold time on the annealing.